The South Platte Water Renewal Partners (SPWRP) Septic Waste Hauling Program provides an EPA approved receiving station. The receiving station only accepts domestic wastes originating from sanitary uses, specifically from septic tanks and portable toilets from homes and businesses.

Domestic septic wastes are non-manufactured wastes that have been pumped from a septic tank, treatment tank or waste holding tank and hauled to another location for final treatment or disposal. Wastes of any origin other than domestic, such as commercial and industrial processing wastes, water from a groundwater test, or water from a construction operation or process, may NOT be discharged as septic wastes. It is illegal to discharge hauled waste directly into the wastewater system (sewers) at any other location other than at an approved waste receiving station.

The SPWRP’s septic waste receiving station was constructed to protect local water resources by providing a convenient, easy to use service, for the disposal and subsequent treatment of septic wastes. The septic waste receiving station provides a safe way to integrate these wastes into SPWRP’s treatment process safely while minimizing odors. The strict regulations and requirements of the septic waste receiving station ensures that the SPWRP can effectively protect public health, safety and the quality of the South Platte River watershed by ensuring that these types of waste are managed and disposed of properly (Englewood Municipal Code 12-2-5).

Detailed program regulations and requirements can be accessed below.

 

How to Obtain a Septic Permit with SPWRP

Prior to discharging septic wastes at SPWRP, the septic waste hauler must first:


Step 1 | Obtain Permit Application & Submit to SPWRP

New haulers: must submit a permit application¹ and a $100 permit fee (check payable to South Platte Water Renewal Partners)

Existing haulers: may renew their current permit by submitting a new signed permit application¹ and a $100 permit fee (payable to South Platte Water Renewal Partners), thirty (30) days prior to the end of their current permit term


Step 2 | Complete a “SPWRP Waste Hauler Information Form”

Waste Hauler Information Form²


Step 3 | Obtain a surety bond & submit to SPWRP

  • A surety bond is a three party agreement under which the (1) surety, guarantees to the (2) obligee, the performance of an obligation by the (3) principal.
  • Listed as a requirement in the SPWRP septic permit, each surety bond’s amount is determined by the septic hauler’s prior discharge history. New septic haulers’ surety bond’s amount will be no less than $1,000 and estimated on expected discharge volume.

Step 4 | Pass vehicle inspection on each septic hauling vehicle

  1. Schedule an appointment by calling 303-762-2634 and bring vehicle to SPWRP for inspection
  2. Provide proof of vehicle registration and insurance (one per vehicle)
    • Note: Certificate holder is the “City of Englewood” on a Certificate of Liability
  3. Complete and sign a “Gate Access Card Request” form³  (one per vehicle)
  4. SPWRP will give one gate access card to each vehicle, which provides access to discharge at the septic waste receiving station (7 AM to 7 PM, Sunday – Saturday)
    • Note: Existing haulers may add vehicles, obtain gate access cards, or updated vehicle information to their existing permit by submitting the corresponding forms to bvarner@englewoodco.gov

Applicable fee payments will be required with all submissions. The SPWRP Septic Waste Hauling Program Administrator will issue a final Septic Waste Permit once all permit requirements are fulfilled. Please allow at least thirty (30) days to process all new applications.

Vehicle Inspection

All non-registered Septic Waste Fleet Vehicles are required to be inspected and photographed by SPWRP personnel. SPWRP inspects each vehicle’s condition and confirms the truck’s discharge capacity. All other pertinent information will be compiled into the hauler’s permit with the City of Englewood. Upon passing vehicle inspection, the vehicle will be eligible to discharge at the City’s approved receiving station (SPWRP’s septic waste receiving station). These inspections must be scheduled in advance by emailing the SPWRP Septic Waste Hauling Program Administrator at bvarner@englewoodco.gov. Once scheduled, inspections for haulers with a single vehicle will be held individually at the main administration building of the SPWRP at 2900 South Platte River Dr., Englewood, CO 80110. Vehicles that fail an inspection must make all required corrections and then contact the SPWRP to schedule another inspection.

Manifesting Requirements

All hauled septic waste must be manifested using the SPWRP manifest forms.

Disposal Fee Collection Procedures

Septic waste haulers must pay disposal fees to SPWRP for discharging any septic waste loads at the City approved receiving station (SPWRP SWRF). SPWRP establishes accounts that customers can use for their entire fleets and draw from in conjunction with each load discharged at the receiving station. Disposal fees are drawn from the customer’s account on a per gallon basis, based on a per load basis and applied as 100% of the truck’s discharge capacity. No disposal account can be activated until the hauler has obtained all necessary permits. Payment options include check, money order or combinations thereof.

Discharging at the City Approved Receiving Station

The City of Englewood’s approved receiving station for hauled septic wastes is located at South Platte Water Renewal Partners (SPWRP), Septic Waste Receiving Facility (SWRF) at 2900 South Platte River Dr., Englewood, CO. 80110. The SWRF accepts septic tank waste, portable toilet waste, and domestic waste ONLY. Refer to the Englewood Municipal Code 12-2-5 for more information about discharging industrial wastes. The receiving station is normally open for business everyday between 7:00 am and 7:00 pm.

Interactive Service Map

Use this search function to determine the Sewer District, Water District and Storm Drainage District for your address. It will also provide additional information on the service provider, billing provider and contact information.

Learn More

Community Events

The South Platte Water Renewal Partners hosts four major community events annually where community members are invited to visit our facility and learn about the water renewal process. We also partner with the Cities of Englewood and Littleton at their events to educate the community on the water renewal process.

Learn More

Water Renewal Process

At the South Platte Water Renewal Partners we use a biological treatment process that harnesses the natural power of native bacteria to sustainably clean and renew water using the least amount of chemicals and energy.

Learn More